NETHERLANDS 500KW

The plant was completed in 2020 in the Netherlands. Construction lasts 20 days.
The installed power is 500 KWp. Jinko solar panels are installed, as well as Huawei inventories, model KTL 185. The produced energy is sold entirely at preferential prices.